The overhead wood portions have all been installed, and painted on ALL surfaces (even unexposed areas) in order to at least slow down decomposition related to the elements. Code does not require a railing for this porch since it's only 24" above ground level, but we like to add a low railing to help "ground" the porch, and add a more finished look.
Electrical wire has been run, and boxes installed into 6 of the columns for sconce lighting.








Once all the woodwork is done, the concrete steps and welcome-walls will be poured in preparation for the pavers that will lead to the patio area. Can't wait to share the finished photos with you.
Happy New Year!