Friday, April 8, 2011

Here and There

Progress is apparent all over the house on this project! Marble tile has gone down on the floor and into the shower stall in the master bathroom. (Covered on the floor for protection during construction!)

More porcelain tile ready to be installed in another bathroom. An existing fireplace surround has been removed in preparation of new tile and trims. The existing ceiling wood adds a neat texture to the new stairwell.

Paint is appearing on the walls, and slowly but surely details are appearing that will give this old home it's shiny new personality.

0 comments:

Post a Comment